From the day we measure to the day your new counters are in, most Kelowna countertop projects take one to three weeks. The installation itself is usually a few hours to most of a day. The rest of the time is fabrication: cutting and finishing your slab to the exact shape of your kitchen. Below is the full timeline, what happens at each stage, and the things that make a project faster or slower.
Template to finished install is typically one to three weeks. Install day itself is a few hours for a bathroom vanity and up to a full day for a large kitchen with an island and seams.
The timeline at a glance
A countertop replacement is not a same-day job, because your slab has to be fabricated to measurements taken in your home. Here is how a normal project flows:
- Day 1 - Template and measure. We come to your home and take precise digital measurements once your old tops are off and the cabinets are set.
- Days 2 to 10 - Fabrication. Your slab is cut, the edges are profiled, and the sink and cooktop cutouts are made during fabrication.
- Install day. We deliver and set the finished pieces, join any seams, secure everything, and seal where needed.
For most quartz and granite kitchens in Kelowna, that whole sequence lands inside one to three weeks. Rare imported slabs that need to be ordered in can add time at the front.
Step 1: the template appointment
Templating is where accuracy is won or lost. We measure the actual cabinets, note the sink and faucet positions, overhangs, and any walls that are out of square. For the template to be exact, the base cabinets need to be level and in place, and the sink and cooktop should be on hand so the cutouts match. This visit is quick, often around half an hour in your kitchen, but it sets up everything that follows.
Step 2: fabrication
This is the part people underestimate. Once we have the template, your slab is cut to shape, the edge profile you chose is ground and polished, and the cutouts for sinks, cooktops and faucets are made. Fabrication typically takes a few days to about a week and a half depending on how busy the schedule is, how many pieces your layout needs, and the edge detail. A simple straight run moves faster than a large island with a waterfall edge and a full-height backsplash.
Step 3: installation day
On install day we bring the finished pieces to your home, dry-fit them, and set them onto the cabinets. We join any seams with colour-matched adhesive, level and secure everything, and seal natural stone where it is needed. A bathroom vanity can be done in a couple of hours. A typical kitchen takes a few hours to most of a day, and a large kitchen with an island, multiple seams and a stone backsplash can run the full day.
Plumbing is usually disconnected before we arrive and reconnected after the counters are set, often the next day once any adhesive and sealant have fully cured. We will tell you exactly how your project is sequenced.
What makes a project faster or slower
- Material and slab availability. In-stock quartz and common granite move fast. A rare imported slab that has to be ordered adds lead time before anything can be cut.
- Layout size and complexity. More square footage, islands, seams and cutouts all add fabrication time.
- Edge profile. A standard eased or bevelled edge is quick; ogee, mitred and waterfall edges take longer to fabricate.
- Backsplash. A full-height stone backsplash is a second set of pieces to template, cut and install.
- Shop schedule and season. Spring and early summer are busy renovation months in the Okanagan, which can stretch the fabrication window.
Repairs and small jobs are much faster
Not every job needs the full timeline. A chip, crack or dull spot usually does not mean a new countertop. Our mobile repair comes to you, and most chip repairs are done in a single visit. Quartz repairs typically take one to four hours depending on the type of damage, so a small mishap rarely turns into a week-long project. If you are not sure whether you need a repair or a replacement, send us a photo and we will tell you honestly.
Frequently asked questions
How long does countertop installation take from start to finish?
Most countertop projects run one to three weeks from the template appointment to install day. The gap is fabrication time, when your slab is cut and finished to your exact measurements. In-stock quartz and common granite are at the faster end; a rare imported slab that has to be ordered adds time.
How long does the actual installation day take?
A bathroom vanity is often a couple of hours. A typical kitchen takes a few hours to most of a day, and a large kitchen with an island, multiple seams and a stone backsplash can take the full day.
Can countertops be installed the same day they are templated?
No. The slab has to be fabricated to the measurements we take in your home first, which takes a few days to about a week and a half. Templating and installation are separate visits.